About us
Our customer base continues to strengthen and diversify throughout Nigeria, the North Sea and beyond. Our consultants have completed a number of workscopes for clients, some of which remain confidential. However we will be happy to help define your requirements and provide a detailed proposal for meeting them.
Activities
Some recent activities by our consultants
- Field Studies for En- Nagha field - Petro-Canada Asset, Libya (Dec 2010-Feb 2011).
- Gas Field Development for Medias Field - Romania (Sept 2010 - Dec 2010).
- Reservoir Studies for Sirikirt Field (Waterflood Project) - Bangkok Thailand (June 2010 - Sept 2010).
- Reservoir Numerical Studies on Hamada - NC8A pool - Libya/France (July 2010- Sept 2010).
- Reservoir Simulation Training using CMG (2009) Conswell Limited/Department of Petroleum Resources (Nigeria).
- Fluid Modeling Course using CMG WinProp Software (2009) Conswell Limited/ Department of Petroleum Resources (Nigeria).
- Reservoir simulation and Geomodeling Training for Ministry of Petroleum Resources (Corporate Head quarters Staff Abuja) (2009).
- Design and installation of mechanical strengthening clamps on a damaged firewater caisson (UK North Sea operator) to mitigate the dropped object risk (2010).
- Structural integrity management (UK North Sea operator). Scope includes 2 manned complexes consisting of 7 fixed jacket structures, 13 satellite platforms and a gas processing terminal (2010 to date).
- Asset life extension project (UK North Sea operator) for Southern North Sea Satellite platforms (Fixed jacked structures). Scope included offshore surveys, in-place re-analysis with corrosion sensitivity study using SACS 5.5 and preparation of structural B.O.D (2010 to 2012).
