Slide Slide Slide Slide Slide Slide Slide Slide ‹‹ ››

About us

Our customer base continues to strengthen and diversify throughout Nigeria, the North Sea and beyond. Our consultants have completed a number of workscopes for clients, some of which remain confidential. However we will be happy to help define your requirements and provide a detailed proposal for meeting them.

Learn more ››

Activities

Some recent activities by our consultants

  • Field Studies for En- Nagha field - Petro-Canada Asset, Libya (Dec 2010-Feb 2011).
  • Gas Field Development for Medias Field - Romania (Sept 2010 - Dec 2010).
  • Reservoir Studies for Sirikirt Field (Waterflood Project) - Bangkok Thailand (June 2010 - Sept 2010).
  • Reservoir Numerical Studies on Hamada - NC8A pool - Libya/France (July 2010- Sept 2010).
  • Reservoir Simulation Training using CMG (2009) Conswell Limited/Department of Petroleum Resources (Nigeria).
  • Fluid Modeling Course using CMG WinProp Software (2009) Conswell Limited/ Department of Petroleum Resources (Nigeria).
  • Reservoir simulation and Geomodeling Training for Ministry of Petroleum Resources (Corporate Head quarters Staff Abuja) (2009).
  • Design and installation of mechanical strengthening clamps on a damaged firewater caisson (UK North Sea operator) to mitigate the dropped object risk (2010).
  • Structural integrity management (UK North Sea operator). Scope includes 2 manned complexes consisting of 7 fixed jacket structures, 13 satellite platforms and a gas processing terminal (2010 to date).
  • Asset life extension project (UK North Sea operator) for Southern North Sea Satellite platforms (Fixed jacked structures). Scope included offshore surveys, in-place re-analysis with corrosion sensitivity study using SACS 5.5 and preparation of structural B.O.D (2010 to 2012).

Please contact Petrosage today for more details